Mold-Masters Sportsplex Arena Expansion (LEED Silver)

A 70,000 square-foot arena addition features innovative and energy efficient design solutions (LEED Silver).

Sector: Multi-Use Recreational
Status: Complete

About the Project

The expansion of the existing Georgetown arena sees the addition of two NHL-sized ice rinks and 10 new dressing rooms and referee rooms. In this modern retrofit, the space becomes fully accessible and energy efficient, incorporating 2,000 solar panels towards the generation of renewable energy. The complex also hosts charging stations for electrical vehicles, occupancy sensors to reduce overall electrical consumption, and a roof de-icing/snow melting system.

Related Projects

Back to Projects Page